Tuesdat 11th August 2026
Two jobs in the frame today, one led by John W and one by Jeremy.
John W:
Afternoon Broadway team, Vin, Andy, Simon and myself. The task tomorrow is to replace the wobbly steps on a stile that was installed about two years ago. We can get access to the field below but it will still mean an approximate 300m walk up hill with the tools and materials.
I have put aside a couple of uprights for the top step and I’m hoping we can reuse the existing top step uprights on the bottom step. I have the necessary fixings
If we have time, we can also recce the floating bridge that is nearby and needs new handrails and possibly extending.
Jeremy:
Team Willersey ( Myself , Vin, Mike , Pat & David) will be repairing a KG at Warners Farm , Willersey ( see attached) with replacement of rotten strike post and another post . I hope to reuse the rails .
Mike . Access is through Warners Farm and will brief you in detail tomorrow . Vin, parking is available in front of the farmhouse and I will give the Farmer Bill Painter a heads up . Don’t think Gearald will be there much before 1000 hrs .
Loading . Subject to agreement with John when we load tomorrow I hope we can fit everything on Gerald for both tasks so that Mike can come straight over to Warners Farm after dropping off Broadway team & kit / materials .


.jpeg)

.jpeg)
.jpeg)
.jpeg)

.jpeg)

.jpeg)

.jpeg)
.jpeg)
Comments
Post a Comment